Firstly ensure that the OPTUS-DSL.dwg template is used . Note that all new work is noted as ‘PROPOSED’, and all relevant existing features are noted as ‘EXISTING’. Drawing issue status is marked FOR APPROVAL. Note that a cover sheet is not usually produced for PRELIMINARY or FOR APPROVAL drawing packages.
If the antenna structure is on a rooftop, the following factors must be considered:
• Determine which equipment is to be mounted on the rooftop for each sector.
• Determine where the antennas are to be...
Inspections
The Supplier will notify Optus at least 24 hours in advance of inspections required or requested to be made by Optus or their representative. Where inspections are required by Council or other statutory or...
As Built Drawings instruction
The Supplier’s QMP must set-out a process for the production of the Site As-Built drawings. As-built drawings are to be produced for all site works that involve any external works or...
Draft Site Layout (DSL) Drawings
Prime & Backup Candidates
Draft Site Layout drawings for the prime candidate are intended for presentation to site providers and relevant authorities, therefore the drawing presentation is important. It should correctly...
The typical types of drawing packages produced for the Optus Project are as follows:
DRAFT SITE LAYOUT (PRELIMINARY) or FOR APPROVAL
NOT FOR CONSTRUCTION
FOR CONSTRUCTION
AS BUILT
NEW WORKS AT EXISTING SITES
The content...