Antenna Structures and Design
Axicom Structures
The expansion of Axicom sub-licence reference design, to include 5G AAUs / additional equipment at eJV Axicom sites, is subject to agreement between the Operators and is currently out of...
New 5G site design project by Revit in ACT Australia
Description
Telecom Equipment family design in Revit
Site Topography
Site design with Revit
presentation rendering with Twinmotion
Prior to Revision 6, the Antennas EME Exclusion Zones drawing (‘R1’), when provided, showed occupational and general public EME exclusion zones ‘plume’ diagrams, based on information provided by Optus, for single isolated antennas with...
Inspections
The Supplier will notify Optus at least 24 hours in advance of inspections required or requested to be made by Optus or their representative. Where inspections are required by Council or other statutory or...
Term / Abbreviation
Description
AB
AS Built
CAD
Computer Aided Drafting
Check-In
Process within the OPTUS Drawing Management System where OPTUS approved drawing file is uploaded into the system.
Check-Out
Process within the OPTUS Drawing Management System to download a...
As Built Drawings instruction
The Supplier’s QMP must set-out a process for the production of the Site As-Built drawings. As-built drawings are to be produced for all site works that involve any external works or...
Draft Site Layout (DSL) Drawings
Prime & Backup Candidates
Draft Site Layout drawings for the prime candidate are intended for presentation to site providers and relevant authorities, therefore the drawing presentation is important. It should correctly...
Optus & Vodafone 5G SOW
General
The initial release of this document is intended to provide all information necessary for site upgrades
to achieve "Phase 1" of the 5G eJV project, at which point a SAED vendor...